Search by job, company or skills

GNP Group

Jr. Engineer

Early Applicant
  • a month ago
  • Be among the first 50 applicants

Job Description

  • Interpretation of drawings. - Studied drawings (structural, architectural, MEP) properly and found mistakes in it and corrected them, so our work never stopped because of errors in drawings

  • Preparing bar bending schedule - A bar bending schedule was calculated for each structure of building so that we could predict how much steel would need to be ordered and when.

  • Preparing schedule of material used & available - By keeping record of used and available materials at site, it was possible to predict when to order materials and to calculate waste percentage while billing of materials or structures.

  • Checking steel & shuttering of footing, slab, beam & column before concreting - Due to the equipment check before concreting, the ongoing work was not stopped, thus the quality of the structure was maintained and the amount of material wastage was reduced

  • Checking DPR/ DLR provided from contractor - It became easy to convey the information about the work going on at the site to the management, and it was also possible to estimate how much manpower would be required to do the work

  • Keeping note on each & every casting work - A record of the completed work was maintained on a daily basis making it easy to find quality reports for any structure in the future and also helped in billing of the structures

  • Performing various field & laboratory tests related to construction materials with contractor engineer - Performed various field & laboratory tests (gradation of material, moisture correction, soil compaction slump cone, cube testing, and water absorption) related to construction materials with contractor engineer.

  • Checking materials received on site - Due to periodic quality checking of material, there was no any type of interruption while using that material.

  • Checking and maintain quality of work during the progress of work - Due to periodic quality check of work, labor, material while work is in progress, no structural damage has occurred so far such as leakage, structural failure, cracks.

  • Site handling & supervise contractor employees - The IB 3 site was systematically supervised so there was no mis-work, re-work, accident and structural damage at the site.

  • Ensure safety & security of all men & material at site at all time -

    Due to safety precautions, there has been no accident on the seat so far

    Job Types: Full-time, Permanent

    Pay: 30,000.00 - 40,000.06 per month

    Benefits:
  • Health insurance
Paid sick time
  • Provident Fund
Schedule:
  • Day shift
Supplemental pay types:
  • Performance bonus
Yearly bonus

Ability to commute/relocate:
  • Ambernath, Maharashtra: Reliably commute or planning to relocate before starting work (Preferred)

Experience:
  • total work: 1 year (Required)


Work Location: In person

More Info

Industry:Other

Function:construction

Job Type:Permanent Job

Skills Required

Login to check your skill match score

Login

Date Posted: 22/10/2024

Job ID: 97408021

Report Job

About Company

Follow

Hi , want to stand out? Get your resume crafted by experts.

Similar Jobs

Jr Site Engineer Chennai Bangalore

Confluence Business GroupCompany Name Confidential

Jr Site Engineer

Unique PropertiesCompany Name Confidential
Last Updated: 22-10-2024 01:53:13 AM