As a lead technician includes the interaction with the Project Engineer(s) with the purpose of installing various audio visual systems; from a simple screen, projector, and wall plate (Condeco) to multiple room installations with control systems, video and audio teleconferencing, and rear projection.
Single & Dual VC Room Installation and responsible for downloading and revising Crestron System Control touch panels and source code video teleconferencing set up (Life - Size), audio teleconferencing setup by acoustics levelling and microphone setup for optimum sound and clarity.
Performed regular checks on activities for Quality Assurance, reported and tracked all defects and ensured that were resolved.
Managing Room Setup Before meeting started with Chairs alignments.
Set up, operated, and removed audio-visual equipment.