Undertake assessment of existing bridges and preparing assessment reports having assessment/design experience in Steel Composite,
Pretension / Posttension structures
- Carry out feasibility studies for strengthening and repair.
- Prepare new bridge design and strengthening design to UK standards ensuring compliance with
appropriate design and health and safety standards and WSP WoW procedures
- Carry out design and assessment checks (Cat II or Cat III) under the guidance of a Senior or
Principal Engineer
- Prepare or assist others in compiling drawings, specifications, reports and correspondence
within given deadlines including checking compliance with the project brief
Follow QA, document control, archiving & CDM guidelines on all work
- Ensure the correct implementation of document control and QA processes are followed for
issue and filing / archiving of all work carried out
- Produce work to specified WSP design standards, suggest revisions to standards as
appropriateensure all relevant standards and guides are used in accordance with UK Design
standards and WSP QA processes (WoW)
- Ensure compliance with AIP or other project requirements
- Use WSP calculation templates and ensure calculation sheets comply with WSP standards
- Use WSP Technical library and Information systems to assist design work
- Ensure only latest version (unless specifically required by AIP) of British and European
Standards are used
Continually strive to develop and increase skills in MIDAS, LUSAS, Superstress, SAM, ARCHIE
and other computer aided design software